Exam:
000-106
Title :
Power Systems with POWER7 Common
Technical Sales Skills - v1
1 / 15
Version :
IBM 000-106 最新题库,自己刚刚考完,很准.希望能帮到您! 1/15
1. Where is specific information regarding height, width, depth, and weight of a Power Systems server
located?
A.Hardware InfoCenter
B.System Planning Tool
C.Offering Information website
D.Technical Delivery and Assessment GuideWArialZ
Answer: A
2. Which system provides the highest performance per core, and the least cost for applications licensed
per core?
A.A Power 795 with MaxCore mode
B.A Power 780 with MaxCore mode
C.A Power 755 with TurboCore mode
D.A Power 780 with TurboCore modeWArialZ
Answer: D
3. An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX
Web server and database workloads, they also have Windows workloads. Which Blade is designed for
Windows workloads?
A.HS22
B.JS43
C.QS21
D.PS701WArialZ
Answer: A
4. Which of the following solutions provides maximum core density per rack?
A.Power 730
B.PS700 Blades
C.PS702 Blades
D.PS703 BladesWArialZ
2 / 15
IBM 000-106 最新题库,自己刚刚考完,很准.希望能帮到您! 2/15
Answer: C
5. The Power 720 is offered with how many cores?
A.1, 2, or 4
B.2, 4, or 6
C.2, 4, or 8
D.4, 6, or 8WArialZ
Answer: B
6. A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet
(IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve
performance.
Which of the following solutions wil help the customer with this issue for the least cost and with the least
interruption?
A.Order a 2-port 1Gbps Ethernet LAN adapter.
B.Order a 2-port 10Gbps Ethernet LAN adapter.
C.Upgrade the IVE adapter to a 4-port 1Gbps IVE adapter.
D.Upgrade the IVE adapter to a 2-port 10Gbps IVE adapter.WArialZ
Answer: A
7. A customer has a Power 750 with the following:
One processor card with 8 cores enabled, and GB RAM installed
One GX+ adapter with one I/O drawer attached
One 4-port 1Gbps IVE adapter
PowerVM Standard Edition
They need to add a GX++ adapter and cable it to an I/O drawer.
Which of the following must also be ordered?
A.A second IVE adapter
B.A second processor card
C.PowerVM Enterprise Edition
3 / 15
IBM 000-106 最新题库,自己刚刚考完,很准.希望能帮到您! 3/15
D.An additional cable-management armWArialZ
Answer: B
8. A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will
support two loops?
A.Power 710
B.Power 720
C.Power 730
D.Power 740WArialZ
Answer: D
9. Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and
Windows on a Power Systems server?
A.AIX
B.IBM i
C.Linux
D.VIO ServerWArialZ
Answer: B
10. A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How
many logical processors are presented to an application running on this LPAR?
A.4
B.8
C.16
D.32WArialZ
Answer: C
11. A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM
(eDRAM) technology?
A.L3 only
4 / 15
IBM 000-106 最新题库,自己刚刚考完,很准.希望能帮到您! 4/15
B.L1 and L2
C.L2 and L3
D.L1, L2 and L3WArialZ
Answer: A
12. Which of the following provide for higher system availability on a single CEC Power 770 or Power
780?
A.Redundant system clock
B.Redundant service processor
C.POWER7 cores include redundant L3 caches
D.Main memory DIMMs contain an extra DRAM chip for improved redundancyWArialZ
Answer: D
13. Which of the following uses compression/decompression to increase the memory available for client
workloads?
A.PowerVM
B.VMControl
C.Active Memory Sharing
D.Active Memory ExpansionWArialZ
Answer: D
14. A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to
have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their
existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3).
Which of these statements is true and would minimize the cost?
A.All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or
later.
B.The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be
managed by this new HMC.
C.They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based
5 / 15
IBM 000-106 最新题库,自己刚刚考完,很准.希望能帮到您! 5/15
systems connected to the existing one.
D.The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the
POWER5 and POWER6 based servers to IVM.WArialZ
Answer: A
15. A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO
Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be
shut down.
Which of these strategies could be used to ensure that the client LPARs continue to be able to use the
network in the event of a VIO Server being shut down?
A.Implement PowerHA SystemMirror on both VIO servers.
B.Configure Etherchannel between the client LPARs and the two VIO servers
C.Configure Network Interface Backup between the two VIO servers and use each VIO server to access
the network.
D.Implement Shared Ethernet Adapter failover and have all client partitions access the network through
the shared adapters.WArialZ
Answer: C
16. A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on
internal disk drives. Which Blade supports the requirement?
A.JS21
B.JS23
C.PS700
D.PS701WArialZ
Answer: C
17. An customer with limited storage management skil s needs a disk subsystem with up to 70TB capacity
and enterprise class performance. Which disk storage system should be recommended?
A.DS6800
B.DS8100
6 / 15
IBM 000-106 最新题库,自己刚刚考完,很准.希望能帮到您! 6/15
C.DS8300
D.XIV Storage SystemWArialZ
Answer: D
18. A customer requires their application to have high availability within a data center, and also the ability
to recover at a data center located 600km away in the event of an outage. Which system software solution
component supports the customer requirement?
A.PowerHA SystemMirror Basic Edition
B.PowerHA SystemMirror Express Edition
C.PowerHA SystemMirror Standard Edition
D.PowerHA SystemMirror Enterprise EditionWArialZ
Answer: D
19. An HMC managed Power 720 with two partitions is being planned. One partition is production, the
other is a test/development partition. Customer management requires the following:
Redundant LAN hardware for the production partition
Dual LAN interfaces
Automatic failover between the redundant physical LAN ports.
Which of the following meets the customer requirement?
A.Order two PCIe dual-port LAN adapters. Use port 1 on each adapter for the production partition.
Configure the test partition to use port 2 of each adapter.
B.Order two dual-port Integrated Virtual Ethernet Adapters (IVEs). Configure the production partition to
use port 0 on each IVE. Configure the test partition to use port 1 on each IVE.
C.Include a PCIe dual-port LAN adapter in the production partition. Configure the production partition to
use a port on the PCIe adapter and another on the Integrated Virtual Ethernet Adapter (IVE). Configure
the test partition to use the IVE.
D.Include a PCIe dual-port LAN adapter in the production partition. Configure the production partition to
use one port on the PCIe adapter and another on the Integrated Virtual Ethernet Adapter (IVE). Configure
the test partition to use the other PCIe adapter port.WArialZ
Answer: C
7 / 15
IBM 000-106 最新题库,自己刚刚考完,很准.希望能帮到您! 7/15
20. Using the following information:
- Performance data from an existing system that a new system wil replace
- Performance estimates that anticipate future workloads
- Micro-partitioning and logical partitioning implementations
Which of the following allows a technical sales representative to create a system design which can be
imported into an HMC?
A.IBM eConfig
B.IBM Performance Monitor
C.IBM Workload Estimator (WLE)
D.IBM System Planning Tool (SPT)WArialZ
Answer: D
21. What is the primary purpose of the Technical and Delivery Assessment (TDA)?
A.Identify, assess, and mitigate technical risks.
B.Verify pricing and gather components for special bid submission.
C.Verify the proposed solution will fit within the customer's budget.
D.Review competitive offerings, system performance and delivery schedules.WArialZ
Answer: A
22. What is the correct stage in the sales process for a Pre-Sales Technical & Delivery Assessment
(TDA)?
A.Before the first solution design meeting with the customer
B.After the solution design proposal is submitted to manufacturing for review
C.Once the customer has supplied the solution design specifications to the sales team
D.After the solution design is completed and before the proposal is submitted to the customerWArialZ
Answer: D
23. A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires
redundant network and SAN adapters. Which configuration supports the customer requirement?
8 / 15
IBM 000-106 最新题库,自己刚刚考完,很准.希望能帮到您! 8/15
A.Configure 2 CFFh combination fibre channel / gigabit Ethernet adapters
B.Configure 1 CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapter
C.Configure 1 CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet
adapter
D.Configure 1 CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit
Ethernet adapterWArialZ
Answer: C
24. A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in
the following configuration:
3 AIX partitions with dedicated network and disk adapters
1 native IBM i partition acting as a host
1 hosted IBM i partition
2 hosted Linux partitions
Which configuration wil provide boot disk capability to all partitions?
A.Use dual-split backplane in both enclosures for the three AIX partitions and the IBM i partition.
B.Put each partition on a dedicated controller using the triple-split backplane option in both enclosures.
C.Use the triple-split backplane option in one enclosure for the AIX partitions, and the default dual-split
backplane for the IBM i partition in the second enclosure.
D.Use the triple-split backplane option in one enclosure for the AIX partitions, and the non-split backplane
mode in the second enclosure for the IBM i hosting partition.WArialZ
Answer: D
25. A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature
of PowerVM should be highlighted as a differentiator?
A.PowerVM offers partition mobility.
B.PowerVM can virtualize network and SAN resources.
C.PowerVM supports multiple operating systems running concurrently.
D.PowerVM allows an LPAR to use activated cores and memory without limitation.WArialZ
Answer: D
9 / 15
IBM 000-106 最新题库,自己刚刚考完,很准.希望能帮到您! 9/15
26. A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6
PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750.
Which action allows the most efficient use of existing equipment?
A.Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.
B.Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.
C.Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.
D.Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer
loops.WArialZ
Answer: D
27. A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of
their existing I/O adapters can be migrated to Power 770 enclosures?
A.PCIe adapters
B.PCI-X adapters
C.PCI-X and PCIe adapters
D.PCI, PCI-X and PCIe adaptersWArialZ
Answer: A
28. A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on
the workload characteristics.
With SMT4 enabled, what is the least amount of processing resources which can be configured for the
LPAR?
A.8 desired processing units and 8 desired virtual processors
B.2 desired processing units and 8 desired virtual processors
C.8 desired processing units and 32 desired virtual processors
D.2 desired processing units and 32 desired virtual processorsWArialZ
Answer: B
29. A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions
10 / 15
IBM 000-106 最新题库,自己刚刚考完,很准.希望能帮到您! 10/15
are subject to varying workloads throughout the day, and two are used for development and testing.
The production applications have different licensing limitations on the number of physical cores that may
be used. The development partitions can use no more than 1 core.
The customer would like to dynamically optimize processor utilization within the licensing limits, with
minimal operator intervention.
Which of the following meets the customer requirement?
A.Define the production partitions' maximum CPU to the licensing limitations.
Define the development/test partition maximums to one core.
Configure each partition to be capped.
B.Define the production partitions' maximum CPU to the licensing limitations.
Define the development/test partition maximums to one core.
Configure each partition to be uncapped.
C.Define the production partitions' maximum CPU to the licensing limitations.
Define the development/test partitions to use no more than one core.
Configure the HMC scheduler to dynamically assign processors among the pools over a day.
D.Create a shared processor pool for each production partition, with the maximum processor limit set to
the licensing limit for the application in the pool.
Assign the development and testing partitions to a processor pool with a maximum of 1 core.
Configure each partition to use uncapped processing.WArialZ
Answer: D
30. A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores
and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night,
batch processing is exceeding the run window.
Which solution addresses this problem without requiring additional hardware?
A.Adding VMControl will automate processor resource allocation during peak workloads
B.Enable Dynamic Symmetric Multithreading in the HMC to balance workloads across processors.
C.Add processing resources during the times they are required using Utility Capacity on Demand.
D.Changing the partitions to Uncapped can make use of additional processor cycles during peak
workloads.WArialZ
11 / 15
IBM 000-106 最新题库,自己刚刚考完,很准.希望能帮到您! 11/15
Answer: D
31. A customer plans to consolidate multiple business unit applications on a single Power Systems server.
The maximum number of cores which can be used by each business unit must be limited by creating
shared processor pools.
What is the minimum PowerVM Edition which provides this feature?
A.Basic
B.Express
C.Standard
D.EnterpriseWArialZ
Answer: C
32. Which of the following includes Active Memory Sharing (AMS)?
A.PowerHA Enterprise Edition
B.PowerVM Enterprise Edition
C.VMControl Enterprise Edition
D.Systems Director Enterprise EditionWArialZ
Answer: D
33. How can resource allocations for an active partition on a Power 750 be changed immediately and
permanently?
A.Use Capacity on Demand to add the resources.
B.Use DLPAR to add the resources and select the 'permanent' option.
C.Use DLPAR to add the resources, and change the partition profile.
D.Use an Operating System command to permanently request the resources.WArialZ
Answer: C
34. A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other
for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which
of the following meets these requirements?
12 / 15
IBM 000-106 最新题库,自己刚刚考完,很准.希望能帮到您! 12/15
A.Create a system profile for each partition.
Assign all needed resources as 'required'.
B.Define al system resources as 'desired' on the Testing partition.
Activate only as needed.
C.Create two shared processor pools.
Assign the minimal I/O resources required for each partition to the shared pools.
D.Create both partitions with minimal 'required' resources, and optional resources as 'desired'.
Activate each partition as necessary.WArialZ
Answer: D
35. While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization
(NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?
A.NPIV and vSCSI both require multipathing in VIO Server only.
B.NPIV requires multipathing software on client LPARs, vSCSI requires multipathing software on VIO
Server
C.NPIV requires multipathing software on VIO Server, vSCSI requires multipathing software on client
LPARs
D.NPIV requires multipathing and MPIO software on VIO Server LPARs, vSCSI requires multipathing
software on VIO Server and MPIO on client LPARsWArialZ
Answer: B
36. Which of the following is included in IBM Systems Director Express Edition?
A.Energy management
B.Virtual image deployment
C.Virtual resource management
D.Networking device managementWArialZ
Answer: D
37. A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX.
What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for
13 / 15
IBM 000-106 最新题库,自己刚刚考完,很准.希望能帮到您! 13/15
both servers from a single console?
A.PowerVM Standard Edition
B.VMControl Standard Edition
C.Hardware Management Console
D.IBM Systems Director Standard EditionWArialZ
Answer: D
38. What are key benefits of IBM Systems Director Standard Edition?
A.Backup data
Manage problems
Monitor network system
B.Report problems
Manage servers and virtual environment
Monitor the network
C.Monitor system health and network
Install and manage AIX and IBM i
Manage energy consumption
D.Monitor system health and network
Manage servers and virtual environment
Collect performance dataWArialZ
Answer: B
39. Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager
(AEM) in a data center with high energy utilization?
A.Removes the requirement for Intelligent PDUs
B.Monitor and balance disk speeds according to utilization needs
C.Is a required element for EnergyStar certification of the server/data center
D.Monitor and report power and thermal trending to optimize energy consumptionWArialZ
Answer: D
14 / 15
IBM 000-106 最新题库,自己刚刚考完,很准.希望能帮到您! 14/15
40. A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the
second server. What is the most likely reason for this?
A.An HMC is required for dual VIO servers.
B.Dual VIO servers require a split backplane.
C.A dual VIO enablement code must be entered from the ASMI interface.
D.The second VIO server must be created using the IVM command line interface.WArialZ
Answer: A
41. Which of the following functions can be performed using the Integrated Virtualization Manager?
A.Concurrent firmware updates
B.Management of virtual storage
C.Hot add/remove of I/O drawers
D.Management of Capacity on DemandWArialZ
Answer: B
15 / 15
IBM 000-106 最新题库,自己刚刚考完,很准.希望能帮到您! 15/15
因篇幅问题不能全部显示,请点此查看更多更全内容
Copyright © 2019- baoaiwan.cn 版权所有 赣ICP备2024042794号-3
违法及侵权请联系:TEL:199 18 7713 E-MAIL:2724546146@qq.com
本站由北京市万商天勤律师事务所王兴未律师提供法律服务