  20xx is coming to an end, the new year is nearing. project from mid-April 20xx formal construction to the present, of which the total number of steel pipe gantry workshop area of 9820 square meters, reserved warehouse door frame steel structure with a total area of 3840 square meters, the main body in early June 20xx, 20xx In mid-October across the board into use, the results with the company's leadership and the project department of the hard work of all employees are inseparable, but also our design department, Department of Materials, Engineering and other companies from top to bottom the result of unity and cooperation. In the whole construction process of the project, also deeply aware of the importance of teamwork, some of their own shortcomings, team harmony, etc. are the key factors affecting the smooth progress of the project. To this end, now the fourth quarter engineering work summarized as follows:

  First, the schedule of progress

  In the early stage of construction, under the consistent efforts of the whole company, the whole works well and the project has a good trend from safety, quality and progress. However, the processing of raw materials is an important link. , The audit of its materials related to the acceptance of the project safety, progress and other major links. (Materials often problems: 1, the material does not match the original drawings. Refer to the drawings one by one inspection to ensure that the material is correct; followed by raw materials in the production process to increase its efforts to monitor the company to ensure the correct production of materials for the Do not need to do a good job guarantee .2, raw materials approach the corresponding information is not perfect .It is recommended in the process of distribution of materials, the organization of the corresponding information staff to prepare the appropriate information on the vehicle distribution .3, good drawings review, the original design of common sense I would like to set up the company before the corresponding set of leadership, design, materials, engineering (recommended construction team in the conditions permitting, in the event of the construction site, The meeting will be responsible for the corresponding person in charge of a "pre-Conference" for the drawings, contracts, raw materials collection, material distribution co-ordination, design technology, on-site management issues to do a full range of analysis, co-ordination, Responsibilities, unity team strength.

  In the foundation construction, the weather and other irresistible factors, is affecting the overall project successfully completed the biggest stumbling block, for this site managers should be based on the actual situation of the site, Party, weather and other factors to do the appropriate adjustments, reasonable arrangements for the construction schedule, Effective measures to catch up with the progress of the system. In this, I also deeply aware of their own shortcomings, the face of rainy weather can not reasonably organize workers to do the preparatory work for the latter part of the progress of the work, the corresponding conditions permitting the corresponding time delay caused by the progress of the project to step up , The corresponding surprise overtime is my own lack of management experience, can not be reasonable and effective deployment of workers to fully implement, so in the future work there are many places need to learn to grow.

  Second, the construction safety

  Site construction to be able to truly realize that production safety is a business and personal casting too fine in the premise and protection. We can realize the social attitude of "people-oriented, safety first", and can realize the importance and necessity of safety facilities, safety education and prevention. In the early stage of construction, do a good job of worker safety education, the signing of the corresponding labor contract, the security at the end, always bear in mind safety awareness, reserved warehouse project midway construction workers in the process of fall, as the scene responsible for people I can not Shirking responsibility, in the company's leadership under the same concerted efforts to take appropriate emergency measures for the injured in a timely and effective fight for the most valuable time to rescue, making the final health recovery workers to provide a strong guarantee for this I also reflect on their own deep, In the future construction site safety management work, always do a good job "Sambo, four, five edge", the construction of civilization, the safety education of workers, investigation of security risks as the focus of the work and the development of specific security Implementation of programs and measures for the smooth conduct of escort the project.

  Third, the construction quality

  A hundred years, quality-oriented. project, with the already completed, but still left a lot of thorny issues, such as: roof tile sun lap at the water leakage, wall windows leaks ... ... to the party's production has caused some impact, but also for the company The unnecessary loss, which I am deeply guilty, has been working to repair. In view of the above, I think in the construction process of the construction process to monitor their time, to avoid the workers paralysis thinking, to work with the team signed a technical agreement, if necessary, the quality of the agreement signed and develop the appropriate quality inspection cycle, found in the construction process quality defects The implementation of the implementation of the settlement, and truly quality problems in the dynamic management of quality inspection within. In strict accordance with national norms, standards and household acceptance criteria for the construction, the quality of the implementation.

  Fourth, cost control and project advance payment

  1. Cost control

  1) material control: the construction of the early preparation of a detailed construction budget and material consumption plan, in the construction process according to site conditions changes, design changes, negotiation and other factors gradually improve. The construction team with the task list to receive materials, materials, out of the library has a detailed record. To ensure the normal supply of materials in the circumstances, to eliminate waste.

  2) the use of new technology, reduce labor, improve efficiency to increase efficiency (combined with the actual situation on the site may be).

  2. Project advance payment

  And Group Co., Ltd. signed a construction contract in the terms of the project advances, the construction unit there arrears and delays, which makes the smooth progress of the project have also been affected, in view of this issue on-site managers to fully do a good job under the premise of engineering work to ensure, Party A to do a good job when the communication, to ensure that the payment of funds for the company to do the most effective back-up guarantee.

  With the contract team signed a labor contract, we have never had arrears in accordance with the contract, with occasional delays, the scene also do a good job to appease the work to ensure that the final so that migrant workers safe and secure the work, happily home.

  Looking back at this year's work there is growth and lack of clear analysis of their work in the shortcomings and advantages of understanding the gap, to accept the lessons learned in the future work to avoid weaknesses, improve and improve the construction method, which is a valuable asset for future work . Gradually improve their views and consciousness, and continuously improve the professional quality and level, strengthen the sense of responsibility, cultivate love and dedication, people-oriented, strengthen management and enhance team spirit. Let us Engineering Department of the results of the identification of "brilliant Zheng Tong, show iron army style."